No driveway? If you park on the street, a new rule could make home EV charging easier. Since 21 October 2026, a qualifying charger and pavement cable channel in England can be installed without a separate planning application. But it is not permission to cut into the pavement. Your highway authority still has to approve the channel, so check its local scheme before buying a charger.

Quick answer

  • The new planning right applies to a qualifying pavement-embedded cable channel and dedicated home chargepoint in England. A loose cable across the footway is not covered.
  • Your highway authority decides whether your street and proposed installation are suitable. Its consent and any street-works permissions are separate from planning permission.
  • The government's 'up to £300' saving concerns a planning application you may no longer need. A separate chargepoint grant may cover up to £500, subject to eligibility and approval before installation.

Who this affects: For people in England who live without a private driveway or other exclusive off-street parking and want to charge an EV parked legally on the street using their home electricity supply. The planning change is England-only. Council schemes, property permissions and site suitability vary. The separate chargepoint grant has UK-wide eligibility rules.

What changed on 21 October 2026?

The new England permitted-development order gives planning permission in advance for certain home EV outlets and pavement-embedded cable channels. If your proposal meets its conditions, you do not have to make a separate planning application for those works. The Department for Transport's announcement describes a possible saving of up to £300 in planning fees. That is not a payment or a guaranteed reduction in your full installation quote.

This is a planning change, not permission to alter the pavement yourself. The channel must be installed by, for, or with the authorisation of the highway authority. A cable crossing the footway from the home charger to the vehicle must use an authorised cross-pavement solution. The home outlet must be a dedicated EV chargepoint rather than an ordinary domestic socket.

Which size and location rules matter?

The order's wall-outlet provisions say a wall-mounted outlet cannot be installed more than 1.6 metres above ground under this planning right. If the wall immediately adjoins the highway, the outlet must not project more than 20 cm from it. There must also be at least 1.5 metres of footway between the outlet's outer edge and the road. Those last two measurements do not apply to every charger position. The new route also does not cover adding more than one wall outlet within the relevant domestic grounds; ask the planning team about a second outlet. A charging post has separate conditions.

The channel does not qualify under the new channel right within a conservation area, the grounds of a listed building or a scheduled-monument site. When it is no longer needed, the order requires its removal and the pavement's reinstatement as soon as reasonably practicable. Agree who will arrange and pay for that before installation. If your property is protected, ask the council's planning team what consent is needed rather than assuming the new right applies.

What is cross-pavement EV charging?

A typical setup has a dedicated chargepoint at home and a narrow cable channel set flush into the pavement. While the car is charging, the cable lies inside the channel between the house and a car parked at the kerb. You remove the cable when charging ends. The council assesses whether pedestrians, including wheelchair users and people with visual impairments, can use the footway safely. The Department for Transport's guide to cable-channel designs shows examples. Its older planning section predates the 21 October 2026 change.

A loose cable, cable mat or temporary cover is not the pavement-embedded channel covered by the new planning right. A council may have a separate policy on temporary covers, so check its local rules. The installer and council must agree who owns, inspects, maintains and eventually removes the channel.

Will your home and parking space qualify?

This may be useful if you have no driveway, can fit a dedicated charger on your property and can usually park lawfully near it. Your council will check the pavement's width and construction, other buried services, crossings, junctions and local parking restrictions. Some councils have only a trial scheme; others may not permit channels yet. North Northamptonshire Council, for example, says its local trial must launch before residents can participate.

Installing a channel does not reserve the parking space outside your home. If another vehicle parks there, you may be unable to charge that day. The government's local-authority guidance says the channel gives no ownership or priority over the bay.

If you rent, own a leasehold property or live in a flat, get any needed landlord, freeholder or managing-agent permission as well. A separate government consultation on charging access for tenants and leaseholders closes on 16 December 2026. Its main proposal concerns homes with off-street parking; it has not created a new right to install a cross-pavement charger. The England planning change does not alter the planning rules in Scotland, Wales or Northern Ireland.

How do you arrange an approved installation?

Before spending money, gather your address, whether you own or rent, photographs showing the front of the property and kerb, the pavement width if known, and details of legal nearby parking. Have the proposed charger position and your EV or vehicle order ready. Then follow this order:

  1. Find your local council and ask for its EV cable-channel or cross-pavement charging policy. Ask which team is the highway authority; in a two-tier area it may be the county council rather than the district council.
  2. Ask the highway authority whether it accepts applications at your address, which products and installers it permits, what permission or street-works licence is needed, and who pays for maintenance or removal. Get its decision in writing.
  3. Check with the council's planning team whether your exact charger and channel qualify for the new right, especially in a conservation area or near a listed building. Obtain any landlord, freeholder or private-road owner consent.
  4. Get an itemised quote for the channel, dedicated chargepoint, electrical work, permits, any insurance, maintenance and future removal. For a grant claim, choose an approved chargepoint installer and follow the grant sequence before installation.
  5. Keep the highway permission, property consents, grant approval, quote and installer details. Arrange installation only once the relevant permissions and funding decision are in place.

Do not dig into a public pavement or assume a contractor can start just because planning permission is no longer needed. The government's cross-pavement guidance explains that the authority must assess safety and accessibility and that street-works permissions can still apply.

What will it cost, and can you get a grant?

There is no national installation price. Your quote depends on the pavement, electrical work, the council's model and any ongoing fees. The planning change may remove an application fee of up to £300 for a qualifying scheme. It does not pay for a channel, charger or electricity.

The current EV chargepoint grant for households with on-street parking covers 75% of the eligible chargepoint purchase and installation cost, capped at £500. It does not say the pavement channel itself is paid for by this household grant. You need a qualifying permanent cross-pavement solution, no exclusive off-street parking, an eligible EV or order, highway-authority consent and an approved installer. The scheme is listed to close on 31 March 2027, subject to change. It covers qualifying homes across the UK, but the new planning right discussed here applies only in England.

Apply and wait for the grant decision before installing the chargepoint; the grant cannot be backdated. If approved, the installer deducts the grant from your invoice and claims it. Check the grant's application steps and current terms before agreeing to work.

For an illustration, suppose an eligible chargepoint and its installation cost £900 and a channel costs £800. Seventy-five per cent of £900 is £675, so an approved chargepoint grant would be capped at £500. The illustrative total would be £1,200 after that grant (£900 + £800 - £500), before any other fees. These are made-up prices, not a market quote or an eligibility decision. Get the actual itemised amount from your council and installer.

Home charging may be cheaper than public charging, but compare your own tariff and charger access. For example, 40 kWh at an illustrative 25p/kWh is £10; the same energy at an illustrative 60p/kWh is £24. That £14 difference ignores charging losses, tariffs' time restrictions, channel costs and times when you cannot park near home. Check your own unit rates before estimating payback.

What if your council does not approve a channel?

Ask whether the council has a planned trial, an approved alternative or nearby public chargepoints. A refusal may reflect pavement width, buried services, access needs or parking layout rather than the planning rule. If you think it has misunderstood your location, ask what evidence would allow it to reconsider. Do not pay an installer to cut a channel while consent is unresolved.

If you are comparing EV costs now, price the public charging you would actually use and the home setup you can actually obtain. The government's general policy for local authorities is useful background, but your own highway authority's written decision controls whether this location can proceed.

Common questions about EV charging without a driveway

Can I run an EV charging cable or a cable mat across the pavement?

The new England planning right covers a qualifying channel embedded in the pavement, not a loose cable or temporary mat. Government guidance warns that trailing cables can obstruct pedestrians. Ask your highway authority what, if anything, its local policy permits; do not assume a mat is acceptable.

Do I still need council permission if I no longer need a planning application?

Yes. The planning change does not authorise you to cut the public pavement. Your highway authority must agree to the channel, and other permits or property-owner consent may be needed. The government's grant guidance requires evidence of highway-authority consent. Ask the planning team whether your precise charger and site qualify for the new right.

Does the £500 EV chargepoint grant pay for the pavement channel?

The household on-street grant offers 75% of eligible chargepoint purchase and installation costs, capped at £500. Its published description does not promise to fund the channel. Ask the council and installer for a separate, itemised channel quote before comparing total costs.

Can I apply if I rent or live in a flat?

The grant rules allow eligible residents who own or rent their home. You still need any landlord, freeholder or managing-agent permission, plus a suitable council-approved route to lawful on-street parking. Living in a flat does not guarantee that a channel can be installed.

Do I need to have my electric car before applying for the grant?

Not necessarily. The grant rules include people who have ordered an eligible EV. Check the approved-vehicle list and what proof your installer needs. Do not install the chargepoint before the grant decision; the grant cannot be backdated.

Will a cable channel reserve the parking space outside my home?

No. The government's local-authority guidance says a channel gives you no ownership or priority over the adjacent bay. Check how often you can park close enough before paying for installation.

What if I am planning to move house?

The current grant excludes people who are moving or planning to move. Separately, check your council agreement to see who must remove the channel and reinstate the pavement when it is no longer needed.

Go to the source

Read the original information and check current terms before acting.

Department for Transport: 21 October 2026 planning announcement ↗Supporting source: legislation.gov.uk ↗

This article was reviewed before publication. General information, not personalised financial or legal advice. Offers and guidance can change.